
高耐久スラリーポンプ
高耐久スラリーポンプ は High chrome iron / Rubber liner / Duplex と ISO 9906 / Mining duty に対応した仕様を用意しています。OEM 書類対応付きの工場直販価格です。
仕様
主な特長
- -Heavy-duty wet end for abrasive slurry service
- -Impeller and liner options match solids concentration
- -Bearing assembly is sized for harsh mining duty
- -Baseframe and drive can be selected for site conditions
- -Suitable for horizontal pumping stations and skids
アプリケーション
- -Mining tailings transfer
- -Mineral processing plants
- -Cyclone feed circuits
- -Abrasive sludge pumping
- -Industrial solids handling
よくある質問
見積もりを依頼する
必要な数量と仕様を共有します。ご要望に応じたご提案で対応させていただきます。
製品説明
高耐久スラリーポンプ は産業用流体移送向けに、材質、接続、提出書類を構成できます。標準仕様では High chrome iron / Rubber liner / Duplex を採用し、ISO 9906 / Mining duty に対応します。
Heavy-Duty Slurry Pump is engineered for mining tailings transfer, mineral processing plants, and cyclone feed circuits where uptime, hydraulic stability, and material compatibility are critical. The package is designed for industrial duty cycles and export projects that require documented quality control and repeatable performance.
Typical configurations use High chrome iron / Rubber liner / Duplex under ISO 9906 / Mining duty. Options cover flanged connections, expeller / packed gland / mechanical seal arrangements, and v-belt / direct drive packages so the unit can match plant utility, mounting, and maintenance standards.
The product range supports up to 2,500 m3/h, up to 110 m, and 0 c to 90 c. OEM nameplate marking, routine testing, inspection records, and reinforced export packing are available for distributor and EPC orders.
Key Features
Specifications
Applications
FAQ
1. What is the typical MOQ for Heavy-Duty Slurry Pump?
Standard MOQ is 1 unit(s). Mixed project orders and spare-part packages can be arranged for OEM and EPC requirements.
2. Which materials are available for Heavy-Duty Slurry Pump?
Standard materials include High chrome iron / Rubber liner / Duplex. Alternative elastomers, coatings, and alloy upgrades are available on request.
3. Can Heavy-Duty Slurry Pump be customized for project requirements?
Yes. Motor voltage, seal plan, baseplate layout, accessories, inspection scope, and export packing can be customized to the project specification.
4. What lead time and documents are available?
Typical lead time is 3-6 weeks for standard builds. We can provide datasheets, drawings, test reports, MTC, and compliance records for ISO 9906 / Mining duty configurations.


